Upgraded Facilities, Infrastructure, and Fire Safety
The renovation project at John Astor House involved a comprehensive overhaul aimed at enhancing floor space and usability throughout the facility. Key aspects of the work included:
Demolition
Selective demolition of designated areas to optimize the floor plan and increase usable space.
Refurbishment
Complete refurbishment of restrooms, including toilets, showers, and a fully accessible disabled access toilet.
Electrical and Data Installations
Installation of new electrical systems and data infrastructure across both floors, including appropriate containment measures.
HVAC Systems
Kitchen Facilities
Fire Safety Measures
Comprehensive fire stopping in all required areas and installation of new fire doors to enhance safety compliance.
Ceilings and Finishes
Installation of a new suspended ceiling, along with complete decoration and flooring throughout the premises.
All work adhered to the material and installation guidelines set by the NHS, ensuring the highest standards of quality and safety were maintained throughout the project.